Public Comments Sought on Human Service Needs in Pittsfield

Print Story | Email Story
PITTSFIELD, Mass. — The City of Pittsfield, through its Human Services Advisory Council (HSAC), is asking the public to comment on the human service needs in Pittsfield.
 
The Human Services Advisory Council is an 11-member advisory committee that provides funding recommendations to the mayor on how the city should allocate its human services funding. One of the considerations that the council uses to make those recommendations is the input of Pittsfield residents and others.
 
Public comments will be accepted now through 4:00 p.m. on Jan. 31, 2025.
 
Comments may be submitted several ways: by email to Nate Joyner at njoyner@cityofpittsfield.org; by phone at (413) 499-9358; by fax at (413) 499-9340; or by regular mail to Department of Community Development (attention to Nate Joyner), 70 Allen St., Pittsfield, MA 01201.
 
For more information, visit the Community Development page on the city's website, www.cityofpittsfield.org.
If you would like to contribute information on this article, contact us at info@iberkshires.com.

Dalton Public Safety Advisory Committee Ranks Potential Properties

By Sabrina DammsiBerkshires Staff

Use of town-owned lots near the Senior Center would require a town meeting vote as housing had been designated a priority for the former school property. 
DALTON, Mass. — The Public Safety Advisory Committee has ranked four properties to consider during its feasibility study on locations for a new police station. Two have existing structures, including a residential property, and the others are vacant lots.
 
The committee ranked the locations based on a quantitative scoring and weighting process, considering the properties' location, projected cost, size, and whether it is purchase or lease and whether it's vacant or has an existing structure. 
 
Jacunski Humes Architects LLC of Berlin, Conn., selected to conduct the study, will assess what is needed for an efficient and accredited public safety facility at each site. This will include cost estimates and consideration of scenarios such as building a new facility on a green site, remodeling an existing building, and demolishing and rebuilding potential sites. 
 
The property that obtained the highest rank was First Congregational Church's addition, which has offices in the basement with a walkout and some offices on the second floor on the south end. 
 
According to committee co-Chair Craig Wilbur, purchasing or leasing the property is up for negotiation. The congregation has the 2,600 square foot space listed on for lease on its website. 
 
There is also the possibility of constructing a building farther to the east of the existing church using some of the green space and parking lot. 
 
The committee is unsure if the parking lot is available for consideration but opted to keep it on the list so the architect could evaluate all the potential options for the property. 
 
View Full Story

More Pittsfield Stories