ADAMS, Mass. — The Berkshires received more than $600,000 for improvements and planning of recreational trails.
The funds are part of some $12 million in awards announced recently for 65 projects across the state by the state Department of Conservation and Recreation's MassTrails program.
"At DCR, we witness firsthand how trails connect communities across Massachusetts, providing essential opportunities for outdoor recreation, tourism, and economic growth," said DCR Commissioner Brian Arrigo in announcing the grants in Holliston on June 21. "Expanding and maintaining this extensive network is pivotal in improving accessibility and promoting healthier, more vibrant communities statewide. This grant program underscores our dedication to shared stewardship with our municipal partners, fostering collaboration and ensuring sustainable trail management for the benefit of all."
MassTrail awards range from $100,000 to $500,000 depending on the project type and needs, with shared-use paths commanding higher amounts if they demonstrate critical network connections of regional or statewide significance. The matching grants require a minimum 20 percent match and are awarded by reimbursement.
The town of Adams received the highest amount awarded in the Berkshires: $222,000 to acquire easements for a trailhead on Lime Street. The proposed trailhead will enhance access to the Ashuwillticook Rail Trail extension southward that's scheduled for construction in 2028. The town received a $75,000 grant in 2022 for design and engineering. The match for the grant is $73,000.
Plans to bring the rail trail 1.8 miles from Lime Street to Hodges Cross Road in North Adams has been in design since 2012. Notice to proceed on the $9.5 million project was issued in 2019 and it's scheduled to be funded in the 2028 Transportation Improvement Plan. Some $7.7 million of the project will be funded through the federal government.
Eventually, the rail trail will connect in downtown North Adams with a bike path running east from Williamstown. This project is a collaboration of the city and town, the Clark Art Institute, Williams College and its art museum, and Massachusetts Museum of Contemporary Art as the Northern Berkshire Trail Connectivity Development, which received an $82,400 ($20,600 in matching funds) for planning and a pre-acquisition study for cultural, outdoor recreation, and community connectivity.
The 2.4-mile Mohican Recreational Path in Williamstown that ends now near Galvin Road in North Adams will continue east as the North Adams Adventure Trail. The 3.4-mile trail will connect the communities and museum and colleges and run partially through the Tourists resort. Plans by the resort to redevelop the Blackinton Mill includes space and access for the trail; on the other end, Mass MoCA's renovation of Building 6 included a path through the museum and proposes a bridge over the Hoosic River flood control chutes to provide access.
The estimated cost of the project is $36 million and it is currently in the preliminary design phase.
Other awards:
• Lee Bike Trail Project: $120,000 for design completion of a trail to follow the Housatonic River from West Park Street to Big Y Supermarket at the intersection of Routes 20 and 102. The project will consist of paved trails and boardwalk.
• Savoy Kanary Kats Snowmobile Club: $58,420 for annual preventative maintenance of trails in Savoy, Windsor and Hawley. This includes two snowmobile trail groomers, an off-road trail vehicle, and trail groomer drags, batteries, and a saw.
• The state Department of Conservation and Recreation: $47,500 for two all-terrain vehicles and trailer for use in maintaining the motorized trail system throughout Beartown State Forest and its satellite properties in Great Barrington, Lee and Monterey.
• The Berkshire Snow Seekers: $79,875 for the transportation, overhaul and refurbishment by Track Inc. of Newport, Vt., of a 1994 Tucker 1000 SnoCat used at October Mountain State Forest for trail maintenance and purchase replacement hydraulic brakes for the club's 1994 LMC 1800 Sno-Cat used at Pittsfield State Forest.
If you would like to contribute information on this article, contact us at info@iberkshires.com.
Your Comments
iBerkshires.com welcomes critical, respectful dialogue. Name-calling, personal attacks, libel, slander or foul language is not allowed. All comments are reviewed before posting and will be deleted or edited as necessary.
No Comments
Greylock School Geothermal Funding Raises Concerns
By Tammy DanielsiBerkshires Staff
NORTH ADAMS, Mass. — As the Greylock School project moves into Module 6 — design development — there's a nagging question related to the geothermal system.
There's been concern as to whether the system will work at the site and now a second concern is if it will be funded.
The first question is so far partially answered based on investigative drilling at the closed school over the last week, said Jesse Saylor of TSKP Studio.
"There was the potential that we couldn't drill at all, frankly, from the stories we were hearing, but ... we had a good we had a good experience here," he told the School Building Committee on Tuesday. "It is not an ideal experience, but it's pretty good. We can drill quickly, and the cost to drill, we don't expect will be that high."
He had spoken with the driller and the rough estimate he was given was "reasonable relative to our estimate." The drilling reached a depth of 440 feet below grade and was stopped at that point because the water pressure was so high.
The bedrock is deep, about 200 feet, so more wells may be needed as the bedrock has a higher conductivity of heat. This will be clearer within a week or so, once all the data is reviewed.
"Just understanding that conductivity will really either confirm our design and assumptions to date, it may just modify them slightly, or it's still possible that it could be a big change," Saylor said.
The scope of the work includes demolishing the existing roof membrane, flashing insulation and protection boards on the existing flat roof, repairing and repainting the window frames and sashes, and painting and sealing all surfaces.
click for more
Community, education and business leaders are promoting the Northern Tier Passenger Rail Restoration Project as a critical component for economic development. click for more
Monument Mountain's Everett Pacheco took control of the race in the final mile and went on to a convincing Division 3 State Championship on Saturday at Fort Devens. click for more