image description

Pittsfield Youth Lacrosse Team Finishes Spring Season

Community submissionPrint Story | Email Story
PITTSFIELD, Mass. -- The Pittsfield girls lacrosse juniors placed third in the Western Massachusetts Girls Youth Lacrosse B Civision recently.
 
The team is made up of girls in grades 5 and 6.
If you would like to contribute information on this article, contact us at info@iberkshires.com.

Pittsfield Road Cut Moratorium

PITTSFIELD, Mass. — The city's annual city road cut moratorium will be in effect from Nov. 29, 2024 to March 15, 2025. 
 
The road cut moratorium is implemented annually, as a precautionary measure, to ensure roads are kept clear of construction work during snow events and to limit the cuts in roads that are filled with temporary patches while material is unavailable.
 
During this period, steel plates are not to be used to cover open excavations in roads. Also, the Department of Public Services and Utilities will not be issuing the following permits:
 
• General Permit
• Sewer Public Utility Connection Permit
• Stormwater Public Utility Connection Permit
• Water Public Utility Connection Permit
• Trench Permit
 
Limited exceptions will be made for emergency work that is determined to be an immediate threat to the health or safety of a property or its occupants.
View Full Story

More Pittsfield Stories