image description
Area firefighters respond to the report of a structure fire at Craneville Elementary School in Dalton. The Dalton Fire Department has been using a loaned Boston truck.

Craneville Elementary Evacuated After Smoke Fills Building

By Sabrina DammsiBerkshires Staff
Print Story | Email Story

Parents line up to be reunited with their children at the Stationery Factory, the school's emergency location. 
DALTON, Mass. — Pupils at Craneville Elementary School were evacuated from the school on Monday after two motors in the heating and ventilation system burnt out and sent smoke through the building.
 
According to a message to parents from Superintendent of Schools Leslie Blake-Davis, staff noticed an odor at about 10:45 a.m. that "warranted a fire drill."
 
"It has been recommended by emergency personnel that students and staff relocate to the Stationary Factory (this is our emergency relocation site) to allow emergency personnel to ensure the issue is fully resolved before students re-enter the building," she wrote.
 
Two children were reportedly taken to Berkshire Medical Center in Pittsfield by Lanesborough Ambulance for headaches. 
 
"We didn't actually have a fire here today, they had a power outage and they lost a phase on the electrical system and two HVAC motors burned out and sent an odor and smoke haze through the whole building," said Dalton Fire Lt. Zackery Morrissey on Monday afternoon.
 
The smoke set off the box alarm, alerting the Fire Department. 
 
He said school officials were advised to release the students because of the severity of the problem wasn't known. 
 
"We had smoke in the furthest wing to through the whole school," Morrissey said. "So it was kind of hard to figure out which wing, what was going on, and we had to search every classroom and we're still not even done with this."
 
The lieutenant said the first firefighters were on the scene at 10:46 a.m. and he immediately hit a first alarm assignment calling for mutual aid. Other units arrived only minutes later. 
 
"We did an emergency evacuation of the whole school and everybody's being sent home or bussed home, per the school's procedure," Morrissey said. 
 
Parents were lined up at the Stationery Factory after noon to pick up their children. 
 
In addition to Dalton Fire, Dalton Police and Dalton, Hinsdale and Lanesborough ambulances responded.

Tags: fire,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

Letter: What's Happening With Dalton's Finances?

Letter to the Editor

To the Editor:

What's the problem? We are approaching our tax levy limit. As a result of rapid increases in spending over the last four years, Dalton's buffer before we reach our tax levy limit has dropped from $1,200,000 to $772,000 in 2023, which is OK, and likely to be approximately $140,000 in 2026, which is very concerning. If it gets to $0, the town of Dalton will have to cut services and reduce spending in many ways.

What is the levy limit? Proposition 2.5, which is part of Massachusetts law, says that the maximum amount a town can tax its residents (the levy limit) is 2.5 percent of the total assessed overall value of the homes in Dalton plus new growth. New growth in this town has been small for several years. In 2024 the total assessed value of all property was $895,322,865 so the total amount the town could raise from taxes is approximately $22.4 million. In 2024 the total amount of revenue collected was $21.2 million, which means we had $864,000 buffer that we could collect before reaching the levy limit. Each year the assessed value of homes increases, which in turn increases the levy limit and helps Dalton meet its ever-increasing obligations. Over the last four years, the increase in our town's expenses has been outpacing these increases, cutting into our buffer.

Does a Proposition 2.5 override save us? A Prop 2.5 override is intended for large capital purchases. It's like a mortgage, but town governments call them bonds. We did overrides for the new school, repairs to Town Hall and Dalton Division Road, which were then covered by bonds. But overrides are not helpful for annual expenses like salaries, benefits, supplies or any other expense. An override may help us not hit our levy limit, but it is still money that must be raised through taxes to pay for the debt, so it still appears in your taxes.

Speaking of taxes, do you know that if this year's proposed budget passes Dalton's resulting rate of approximately $18.13, which combines the town and fire district tax rates, will likely be one of the highest rates in Berkshire County? Do you know that if a new building is built that costs $15 million this would require a Proposition 2.5 override that would result in an average annual increase in our taxes of approximately $250 per household? If this bothers you, when the time comes you should vote!

What can we do?

Attend the annual town meeting on May 5 at 7 p.m. at the Wahconah Regional High School and VOTE. It might be a long evening but your vote on each item is extremely important in controlling costs and increasing the tools our town government has for the future.

To prepare for the meeting every Dalton resident who is concerned about their taxes and their town should read the annual Town Report, which contains all the financial and policy items that you will be asked to vote on at the meeting. The report will be dropped off at your door by the Boy Scouts on Saturday, April 19. If the report is not clear or, like many others, you have questions, I hope you all will feel comfortable stopping by and talking with me about them. Getting ahold of me is easy. I will be at my campaign office in the old bank across from the Town Hall each weekday from 4:30-6:00. I can also be reached on Facebook at William Drosehn Candidate or instant message me.

Please vote yes on Article 27 for the Capital Planning Committee.

Thank you!

William Drosehn

View Full Story

More Pittsfield Stories