image description
Allison McGee, center, explains the plans for a bike skills park to the Parks Commission on a wet Saturday at Springside Park.

Parks Commission Walks Through Proposed Pump Track Site

By Brittany PolitoiBerkshires Staff
Print Story | Email Story

The bike 'pump' track would be constructed by raising funds. 

PITTSFIELD, Mass. — The Parks Commission took a stroll through Springside Park on Saturday to review the proposed location of a bike skills park. 

Alison McGee, president of the Berkshire Chapter of the New England Mountain Bike Association and program lead for the Little Bellas Berkshire Program, pitched the project to the commission last month.

Garrett Pulley of the Berkshire Mountain Bike Training Series and Kevin Delaney of the Shire Shredders also worked on this project.

The commission approved the concept subject to conducting a walkthrough.

The desired location for the park is northeast of the north playground near Reid Middle School.  The park would include a "pump track," which is a continuous loop of contoured and groomed riding surfaces called rollers and berms, and other features.

The purpose of this track is to provide more outdoor recreation in the city and a place where those who enjoy off-road bicycling can "play."

Owner of Powder Horn Trail Co. Will Conroy constructed the plans for the  park and attended the meeting briefly.

At the walkthrough, McGee outlined material options for the pump track. A full dirt pump track would cost around $100,000 and a paved pump track would cost around $200,000.

She explained that even though a paved track would cost more, it would require much less maintenance. She also noted that Powder Horn specializes in "finish work," which includes preserving the natural surroundings of a project.

The project will be paid for by fundraising independent of the city or park, but McGee said they hope local investment group Mill Town Capital will supplement anything they can't raise.

These plans are flexible, she said, such as the actual location of the pump track.

Chairman Anthony DeMartino brought up the conflict of getting running water to the site, saying a pipe would likely have to be run to the site from North Street and could be costly.

The Parks Commission is in support of the plans for the park, but have a few concerns such as maintenance, liability, and getting water access to the site.

These questions will be addressed in the next Parks Commission meeting on Dec. 15.


Tags: biking,   parks commission,   Springside Park,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

Dalton Fire District Anticipating February Arrival for Ambulance

By Sabrina DammsiBerkshires Staff
DALTON, Mass. — The Fire District is anticipating the arrival of its new ambulance in February. 
 
During a special fire district meeting in December, voters approved borrowing up to $350,000 for the purchase of a new ambulance and any related costs. 
 
The Fire Department has two ambulances: 2019 Ford 550 and a 2016 International. It had been demonstrated during several meetings that both vehicles need to be replaced because of their deteriorating condition. 
 
The district will be trading in both vehicles. The Ford has a trade-in value of $30,000 and the International $2,500. 
 
The new apparatus is an F450 series, a pickup-style, two-wheel drive, so it would have a larger motor and transmission, heavier-duty brakes, and be an all-around heavy-duty vehicle. The anticipated cost is about $345,000 to be rolled out as an Advanced Life Support unit.
 
The district had been discussing investing in a new truck but expected a three-year turnaround. But unanticipated opportunity came up — a buyer had backed out of a vehicle order at the last minute, so an ambulance became available early. 
 
The district got a loan from Greenfield Co-op with a 4.75 interest rate. This loan requires the distinct to take a new loan out every year, so they hope the rate goes down next year, District Clerk and Treasurer Melanie Roucoulet said 
 
The funding for the ambulance is expected at the end of January said Charlotte Crane, fire prevention officer and emergency medical technician, during the Fire District meeting on Tuesday. 
 
View Full Story

More Pittsfield Stories