The MVP Committee last week reviews concepts for the town field developed by RDG.
CLARKSBURG, Mass. — Residents are being encouraged to weigh in on the final design for the PFC Peter A. Cook Veterans Memorial Field.
The first listening session is set for Wednesday, Nov. 13, and the second on Wednesday, Dec. 11, both from 6 to 7:30 p.m. at the Community Center. Dinner will be served and attendees are urged to RSVP here.
The town field is a focus of the Four Corners Project, an initiative to improve the field and prepare for better flood solutions in the face of climate change. The area includes Clarksburg School, the Senior/Community Center and the area around the intersections of West Cross, Cross and Middle Roads.
The town's Municipal Vulnerability Preparedness Committee has been working for two years to find solutions to higher water incursions in the 100-year floodplain and its impacts on the field. The work with the Berkshire Regional Planning Commission has been funded through a state grant.
Regenerative Design Group has come up with three concepts based on projected conditions and a community survey last year.
"This is sort of the gold, silver and bronze, I think," Courtney Morehouse of BRPC told the group at Thursday's meeting. "Concept A is maximizing the recreation and accessibility of the sites or the area ... Concept B is moving what's already there to make it more accessible, and adding recreation. And then Concept C is sort of changing the existing patterns altogether."
All three concepts include recreational areas, gardens/landscaping, parking and pathways at the town field and Community Center. All three also have alternatives for some street side parking.
Concept A includes a baseball field, pickleball courts, basketball courts and a playground where the current basketball court is. Improved parking in the current parking lot and pathways, bridges and observation decks from the school and around the wetlands areas.
Concept B removes the baseball diamond and shifts the pickleball courts to the Community Center to add grass parking and leaves the field open.
Concept C moves both pickleball courts and basketball court to the Community Center and puts the playground south of the pavilion.
"I'm thinking the accessibility trail is probably something like crushed gravel with a grade of no greater than 1 to 2 (percent) whatever it is the standard says, and then the boardwalk is going into the wetlands area," said Morehouse.
The field would be broken up into three areas of restoration to bring back some wetlands, existing field space and active recreation.
Committee members pointed out the need to shift the proposed crosswalk to the Community Center farther south because of the blind corner.
They also discussed the suitability of a playground. "Maintenance is an issue, I think," said member Clebe Scott.
"That's the No. 1 request we got from parents with kids," said Morehouse. "They want, like, somewhere to put their kids ... that can accommodate multiple ages."
Morehouse noted that there were three location options for the playground and that the designers were talking about a "natural playground" with boulders and such.
Up in the air is an accessible pathway from the school to the field. The school had received a $1.2 million Safe Routes to School grant that is currently looking at travel along the road.
Town officials would like more a small lane that connects to the town field to the school driveway but it's not clear MassDOT would fund that.
Morehouse said she didn't know what the requirements are for a road and that might be part of a "mistranslation" with the state.
"A switchback [path] would be difficult. At least having the trail, having the road would be 1,000 times better," said Scott. "We're talking about the school here. We're talking about children, we're talking about traffic jams at the school every single day."
Member Robert Norcross said maybe it's a driveway.
The listening sessions will include a presentation, breakout tables to discuss what residents like and dislike about the plans and chance to add notes to the maps of each one.
Morehouse said those comments will be forwarded to the design group for integration.
If you would like to contribute information on this article, contact us at info@iberkshires.com.
Your Comments
iBerkshires.com welcomes critical, respectful dialogue. Name-calling, personal attacks, libel, slander or foul language is not allowed. All comments are reviewed before posting and will be deleted or edited as necessary.
No Comments
Greylock School Geothermal Funding Raises Concerns
By Tammy DanielsiBerkshires Staff
NORTH ADAMS, Mass. — As the Greylock School project moves into Module 6 — design development — there's a nagging question related to the geothermal system.
There's been concern as to whether the system will work at the site and now a second concern is if it will be funded.
The first question is so far partially answered based on investigative drilling at the closed school over the last week, said Jesse Saylor of TSKP Studio.
"There was the potential that we couldn't drill at all, frankly, from the stories we were hearing, but ... we had a good experience here," he told the School Building Committee on Tuesday. "It is not an ideal experience, but it's pretty good. We can drill quickly, and the cost to drill, we don't expect will be that high."
He had spoken with the driller and the rough estimate he was given was "reasonable relative to our estimate." The drilling reached a depth of 440 feet below grade and was stopped at that point because the water pressure was so high.
The bedrock is deep, about 200 feet, so more wells may be needed as the bedrock has a higher conductivity of heat. This will be clearer within a week or so, once all the data is reviewed.
"Just understanding that conductivity will really either confirm our design and assumptions to date, it may just modify them slightly, or it's still possible that it could be a big change," Saylor said.
The scope of the work includes demolishing the existing roof membrane, flashing insulation and protection boards on the existing flat roof, repairing and repainting the window frames and sashes, and painting and sealing all surfaces.
click for more
Community, education and business leaders are promoting the Northern Tier Passenger Rail Restoration Project as a critical component for economic development. click for more
Monument Mountain's Everett Pacheco took control of the race in the final mile and went on to a convincing Division 3 State Championship on Saturday at Fort Devens. click for more