Winterization Begins at Pittsfield Parks

Print Story | Email Story
PITTSFIELD, Mass. — With the fall season underway and cooler temperatures expected, the City of Pittsfield's Building Maintenance Department has begun the annual process of winterization at parks throughout the city.
 
The process includes both water and power shut-off at park facilities, which also includes splash pads, bathrooms and water sprinklers, through the fall and winter seasons. 
 
Deming Park, Belanger Youth Athletic Facility, and Doyle Softball Complex currently have athletic programs underway
and will be winterized in late October.
 
For more information about the winterization process at city park facilities, please call Building Maintenance at (413) 499-9476.

Tags: parks,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

Dropping Temps, Boiler Repairs Close PHS

By Brittany PolitoiBerkshires Staff

PITTSFIELD, Mass.—Just days before the school gets a temporary boiler, Pittsfield High will be closed for two days due to dropping temperatures causing discomfort inside the building.

Around noon on Tuesday, Superintendent Joseph Curtis announced that the school would have to close on Wednesday, Oct.16, and Thursday, Oct. 17 due to uncomfortable indoor temperatures.

State inspectors cannot look at the new temporary boiler until Thursday.  The school is amid a heating system replacement, as the former boilers exceeded their useful life.

"As you are aware, Pittsfield High School is in the process of having a new boiler installed. In the meantime, a temporary boiler has been set up and placed outside the school," Curtis wrote to PHS families, staff, and students.

"Unfortunately, the Pittsfield Building Maintenance Department informed us that the State Inspector is not available to inspect the temporary boiler until October 17, 2024."

Curtis apologized for any disruption that this may have caused, writing "I understand the inconvenience that unexpected closures or changes can bring and we appreciate your understanding and flexibility."

The missed school days will have to be made up at the end of the school year in June 2025.

"The Pittsfield Building Maintenance Department had initially hoped that temperatures would stay at a comfortable level, but the sharp drop on Sunday and Monday has made the building quite uncomfortable for students and staff, as assessed mid-morning today," Curtis wrote.

View Full Story

More Pittsfield Stories