City of Pittsfield Street Improvement Project: Oct. 9

Print Story | Email Story
PITTSFIELD, Mass. — The following road work is planned to take place starting Monday, Oct. 9:
 
Monday, Oct. 9: Milling of Oakhill Road
 
Tuesday, Oct. 10: Milling of Partridge Road
 
Wednesday, Oct. 11: Milling of Howe Road, Rose Terrace and Elberon Avenue (between Allengate and Yorkshire) 
 
Thursday, Oct.  12  and Friday, Oct.  13: Last course of paving on Oakhill Road, Partridge Road, Howe Road and Rose Terrace
 
Oct.  9-11: Loam and seed on California Avenue and Cloverdale Street
 
On-street parking is prohibited between the hours of 6 a.m.- 6 p.m.
 

Tags: road work,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

Pittsfield Road Cut Moratorium

PITTSFIELD, Mass. — The city's annual city road cut moratorium will be in effect from Nov. 29, 2024 to March 15, 2025. 
 
The road cut moratorium is implemented annually, as a precautionary measure, to ensure roads are kept clear of construction work during snow events and to limit the cuts in roads that are filled with temporary patches while material is unavailable.
 
During this period, steel plates are not to be used to cover open excavations in roads. Also, the Department of Public Services and Utilities will not be issuing the following permits:
 
• General Permit
• Sewer Public Utility Connection Permit
• Stormwater Public Utility Connection Permit
• Water Public Utility Connection Permit
• Trench Permit
 
Limited exceptions will be made for emergency work that is determined to be an immediate threat to the health or safety of a property or its occupants.
View Full Story

More Pittsfield Stories