Lanesborough Connector Road Closures for Repaving
LANESBOROUGH, Mass. — The Connector Road (Mall Road) will be closed to through traffic for several days in September for milling and resurfacing.
The byway between Route 7 and Route 8 will be closed from 6 a.m. to 5 p.m. on Tuesday, Sept. 5; Wednesday, Sept. 6, and Thursday, Sept. 7; and again from Monday, Sept. 11, to Wednesday, Sept. 13.
It will be open overnight on those dates.
Dates may change depending upon weather, any updates to closure dates will be posted.
Tags: paving,