Berkshire Communities Get Culvert Replacement Grants

Print Story | Email Story
BOSTON — The Healey-Driscoll Administration  announced over $6.4 million in grants to strengthen community preparedness for large storms, improve climate-ready infrastructure, restore flood storage capacities, and protect fisheries, wildlife, and river habitat.
 
The Culvert Replacement Municipal Assistance (CRMA) Grant Program is one of the many resources the administration utilizes to help municipalities replace undersized and deteriorating culverts with crossings that meet improved design standards. The grants target culverts whose replacement brings significant ecological and resilience benefits and helps municipalities deal with the increasing aging road infrastructure costs.
 
"With extreme weather becoming more frequent, projects like these are a climate-smart investment to help cities and towns adapt to climate change," said Governor Maura Healey. "It is important that we upgrade culverts and small bridges to prevent flooding and reduce public safety risks. We are proud to announce these awards that will support our communities and ecosystems for generations to come."
 
DER is awarding $811,000 in grants to 14 municipalities through the CRMA grant program. Nearly half of an estimated 25,000 small bridges and culverts in Massachusetts act as barriers to fish and wildlife because they are undersized or poorly positioned. Installing culverts that meet the Massachusetts Stream Crossing Standards allows rivers to flow unrestricted, improves access for fish and wildlife, and lowers the risk of flood damage.
 
In Berkshire County:
 
Karner Brook Culvert Replacement, Egremont 
Award: Town of Egremont, $48,811
This award will fund design and engineering, permitting, and some construction for a culvert replacement project on Blunt Road to improve stream connectivity of a tributary to Karner Brook.
 
Sleepy Hollow Road Culvert Replacement, Richmond 
Award: Town of Richmond, $55,200
This award will fund the design and engineering for a culvert replacement project on Sleepy Hollow Road to improve stream connectivity of Cone Brook and two tributaries.
 
Housatonic River Tributary Culvert Replacement, Great Barrington 
Award: Town of Great Barrington, $55,933
This award will fund the design and engineering for a culvert replacement project on Brush Hill Road to improve stream connectivity of a tributary to the Housatonic River.
 
"Undersized culverts are one of the biggest stressors on Massachusetts stream ecosystems," said Energy and Environmental Affairs Secretary Rebecca Tepper. "Ecological restoration serves our communities and the environment by increasing climate resilience, improving habitat for wildlife, building outdoor recreational opportunities, and creating jobs.
 
DER also awarded $609,825 to support three restoration partnerships through the Regional Restoration Partnerships Program and $26,000 to two Priority Ecological Restoration Projects. Two grants totaling $5 million were awarded to support the Herring River Estuary Restoration project in Wellfleet, one of the largest tidal estuary restoration projects in the North Atlantic coastal region.
 
DER's Regional Restoration Partnerships Program was established in 2021. This Program builds the capacity of local and regional organizations to collaboratively advance restoration work. Pairing partner strengths with the state's investments empowers networks of partners to restore rivers and wetlands and helps people and nature adapt to climate change. 
 
In Berkshire County this includes:
 
Berkshire Clean, Cold, Connected Restoration Partnership 
Award: Housatonic Valley Association, $199,899
This Partnership supports a network of organizations, agencies, and communities working for healthy aquatic systems and building climate resiliency in the Hoosic, Housatonic, and Farmington River watersheds. The Partnership will build local and regional capacity for planning and implementing restoration projects, such as habitat connectivity projects (culvert upgrades and dam removal) and stream corridor restoration projects (floodplain reconnection, in-stream habitat enhancement, and riparian buffer restoration).
 
 
 
 
 
 
 
If you would like to contribute information on this article, contact us at info@iberkshires.com.

Butternut Fire Expands to Sheffield, Covering 1,100 Acres

By Brittany PolitoiBerkshires Staff

The fire expanded during to the night to cover more than 1,100 acres. 

GREAT BARRINGTON, Mass. — The Butternut Fire has expanded tenfold, now covering almost 1,100 acres of forest and spreading to Sheffield.

Just before noon on Wednesday, the town reported that the wildfire near Brush Hill Road off East Mountain had unexpected growth overnight. It spread over 100 acres on Tuesday and on Wednesday, was estimated to cover slightly less than 1,100 acres.

The town remains in a state of emergency, as declared by the Select Board on Tuesday, but first responders assure that Great Barrington is not in danger.

Around 2 p.m., the Great Barrington Fire Department reported via Facebook that "significant fire" was extinguished by using a Blackhawk helicopter to drop 600 gallons of water. Water is now being pulled from Three Mile Pond in Sheffield.

The blaze is being referred to as the Butternut Fire due to its proximity to Ski Butternut, which has confirmed there is no damage to the ski area.

"At this time the fire is more than a quarter of a mile from the nearest structures and there are not any immediate threats to the public. There have NOT been any evacuation orders at this time. We have strategically placed structural fire crews in the areas where there is the POTENTIAL for us to operate in a protection mode to protect homes and property," the town's press release reads.

"In the event of a need for an evacuation order, residents will be notified through Code RED along with in-person door-to-door notifications of the affected area — an information post will be shared on how to sign up if you are already not signed up."

The fire was first reported Monday evening and by 9 p.m., firefighters were pulled from the mountain because of the hazardous conditions. On Tuesday morning, neighboring departments were called in to help contain the blaze.

View Full Story

More South Berkshire Stories