BCC to Offer Flu and COVID Vaccines

Print Story | Email Story
PITTSFIELD, Mass. —?Berkshire Community College (BCC)?welcomes Berkshire Health Systems (BHS) and Community Health Programs (CHP) to campus on?Friday, Dec. 16 from 1:30-3 pm?for free vaccination clinics. 
 
BCC is located at 1350 West Street, Pittsfield. 
 
CHP's mobile health unit, the?"Big Orange Bus,"?will administer Pfizer and Moderna bivalent boosters, COVID vaccines for those age six months and older, and flu vaccines.
 
To schedule an appointment, call (413) 528-0457. Walk-ins are also welcome. 
 
Vaccines are given free of charge; bring insurance cards. 
 

Tags: BCC,   vaccinations,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

Dalton Division Road Project in Pre-25 Percent Design Stage

By Sabrina DammsiBerkshires Staff
DALTON, Mass. — The town's engineers say there is still time to work through the Dalton Division Road project’s design and permitting process. 
 
In December, the Select Board voted to advocate for Concept A, which would have sidewalks on both sides, a 5-foot bike lane in the road on both sides with a buffer, and a 2-foot painted buffer between the vehicle lane and in the bike lane. They also recommended the two-way stop control option. 
 
Since that decision, there have been sentiments to revisit this decision to reduce the cost and improve safety at the intersection off Williams Street, Washington Mountain Road, and Mountain Road. 
 
The original vote would have been the most expensive and "certainly not" the engineer or the state's "preferred design," Town Manager Thomas Hutcheson said during a meeting in November. 
 
During last week's Select Board meeting, Fuss & O'Neil project manager and senior traffic engineer Steve Savaria represented the options, explained potential obstacles, and demonstrated the next steps. Present board members have yet to vote on their final choice. 
 
The project is still in the pre-25 percent design stage and is currently on the fiscal year 2029 Transportation Improvement Program list, so there is "plenty of time" to work out the details. 
 
Since the original vote, some board members have shifted their opinion toward advocating for the most feasible and timely option with a "path of least resistance to get this project done." 
 
View Full Story

More Pittsfield Stories