image description
An image posted to Facebook by the Pittsfield Police Department shows a gray pickup truck sitting inside Samel's Deli on Elm Street. The accident occurred before 10 a.m. on Wednesday.
image description
A pickup truck is removed from the front entrance of Samel's Deli.
image description
Police expect to release more information on the collission.
image description
image description
A structure fire occurred earlier Wednesday 233-235 First St. That incident is also under investigation.

Truck Crashes Into Pittsfield's Samel's Deli

By Brittany PolitoiBerkshires Staff
Print Story | Email Story

Elm Street will be partially closed as cleanup continues. 

PITTSFIELD, Mass. — Wednesday morning was busy for Pittsfield first responders, as a pickup truck crashed into Samel's Deli & Catering and a fire broke out on First Street.

Around 9:45 a.m., the police reported that the street in front of Samel's Deli & Catering would be closed or down to one lane as a result of a two-car collision that sent the truck careening into the deli.

The department posted two photos on Facebook, one depicting the 2008 silver truck with New York license plates crashed through the glass of the front entrance and another of a white Honda CR-V with significant damage to the front end.

"A vehicle was coming out of one of the alleyways here and struck this truck, which continued into the building," Police Officer Craig Jones explained when iBerkshires arrived on the scene.

Jones reported that there was one injury, but not whether it was someone in the vehicles or in the deli. A crossing signal near Samel's front entrance was also taken out by the truck.

Capt. Matthew Hill later reported that the two drivers involved in the accident were taken to Berkshire Medical Center with non-life-threatening injuries. He said no one inside or directly outside of Samel's Deli was injured. The report did not include names or if anyone was being charged. 

Crews worked to clear debris in front of the restaurant as the truck was towed away. That section of the road reopened around 11 a.m.

The police, firefighters and an ambulance responded to the accident and police intend to release a statement on the incident.



Around 6:15 a.m., the Fire Department reported that it had responded to a possible structure fire at 233-235 First St. Windows on all three floors of the multi-family building are now broken or boarded up and the cause is under investigation by the Fire Investigation Unit and investigators from the State Fire Marshal's Office.

Upon arrival, Engine 3 reported heavy fire and smoke from the 235 side of the five-apartment building. A command was established, and a second alarm was called, bringing all on-duty apparatus and personnel to the scene.
 
Engine 3 and Engine 2 initiated an interior attack, while Engines 6 and 5 conducted search and rescue operations. It was unknown if the building was occupied at the time. Engine 1 was assigned as the Rapid Intervention Team (RIT).
 
The fire was brought under control in approximately one hour. No civilian or firefighter injuries were reported. Off-duty Pittsfield fire personnel and the Dalton Fire Department provided mutual aid to cover the city. Eversource and Berkshire Gas secured utilities to the building.


Tags: motor vehicle accident,   structure fire,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

Pittsfield Cannabis Cultivator Plans Dispensary

By Brittany PolitoiBerkshires Staff

PITTSFIELD. Mass. — A cannabis cultivator and manufacturer has opted to sell its products on site in Downing Parkway. 

The Zoning Board of Appeals this month approved a special permit for J-B.A.M. Inc. to operate a dispensary out of its existing grow facility. There will only be changes to the interior of 71 Downing Parkway, as there will be less than 500 square feet of retail space in the 20,000-square-foot building. 

"My only concern would be the impact, and really would be traffic, which I don't think is excessive, the odor, if there was one, but that doesn't seem to be an issue, and I think it's a good location for a marijuana facility," board member Thomas Goggins said. 

The company's indoor cultivation site plan was approved in 2019, an amendment to add manufacturing and processing in 2021, and on the prior day, a new site plan to add a retail dispensary was approved by the Community Development Board. 

J-B.A.M. cannabis products are available in local dispensaries. 

The interior of the facility will be divided to accommodate an enclosed check-in area, front entrance, retail lobby, secure storage room, offices, and two bathrooms. There are 27 parking spaces for the facility, which is sufficient for the use. 

No medical or recreational cannabis uses are permitted within 500 feet of a school or daycare, a setback that is met, and the space is within an industrial park at the end of a cul-de-sac. 

"The applicant desires the restructuring of the business to be more competitive in the industry with the ability to grow and sell their own cannabis products so they have more financial stability," Chair Albert Ingegni III, read from the application. 

View Full Story

More Pittsfield Stories